Precitech-logo-1-

ROB for Titwala Station.

Road Over Bridge (ROB) for Titwala Station in Mumbai is being manufactured at Precitech Facility. Girder height is 2.5 Meters and Span is of 51 Meters.Total Weight of Assembly is around 500 Metric Tons. The Bridge is manufactured for Central Railway.

Scroll to Top